5
5.0
Jan 31, 2023
01/23
by
RUSSIA24
tv
eye 5
favorite 0
quote 0
, and already in february, the builders plan to begin the final stage of repair with details yana shcherbatayalmost 6:00 earlier than it was planned today at 6:30 in the morning the movement of cars on the crimean bridge was resumed, the kerch strait is again possible, but only after a mandatory inspection early in the morning, traffic on the bridge. returned to normal. the car stops at the entrance to the road, the wires inspect the salons and luggage, a procedure that has already become standard and familiar here today . the builders installed the last span to replace those damaged during the terrorist attack on october 8th. during this time, specialists have replaced eight spans, four on each side. this is 500 m of new roadway. today the bridgemen managed in record time. they worked all night on a self-propelled unit , they delivered a span, what does it weigh? three hundred tons to the installation site and with the help of jacks moved the structure to the right place , this process is called sliding by the builders. half hours. on this the most difficult part of the work in the kerch stra
, and already in february, the builders plan to begin the final stage of repair with details yana shcherbatayalmost 6:00 earlier than it was planned today at 6:30 in the morning the movement of cars on the crimean bridge was resumed, the kerch strait is again possible, but only after a mandatory inspection early in the morning, traffic on the bridge. returned to normal. the car stops at the entrance to the road, the wires inspect the salons and luggage, a procedure that has already become...
8
8.0
Jan 31, 2023
01/23
by
RUSSIA24
tv
eye 8
favorite 0
quote 0
yana shcherbataya will tell you all the details almost 6 hours earlier than it was scheduled today atent of cars on the crimean bridge was resumed crossing the strait is again possible, but only after mandatory inspection early in the morning traffic on the bridge. the normal course has returned. the car stops at the entrance to the road, the wires inspect the salons and luggage , a procedure that has already become standard and familiar here today. the builders installed the last span to replace those damaged during the terrorist attack on october 8th. during this time , specialists have replaced eight spans , four on each side, this is 500 m of new.
yana shcherbataya will tell you all the details almost 6 hours earlier than it was scheduled today atent of cars on the crimean bridge was resumed crossing the strait is again possible, but only after mandatory inspection early in the morning traffic on the bridge. the normal course has returned. the car stops at the entrance to the road, the wires inspect the salons and luggage , a procedure that has already become standard and familiar here today. the builders installed the last span to...
6
6.0
Jan 5, 2023
01/23
by
RUSSIA24
tv
eye 6
favorite 0
quote 0
strengthen the armor the equipment is given to the crew only after careful processing of the check, yana shcherbatayabout the work of the masters , though light, but in need of repair. here we have a malfunction in the fire control system. uh, the blocks are out of order. uh, the machine quickly restored and this tank during the battle and the barrel was completely torn off; a fragment of a damaged technician enters the repair regiment immediately from the front line for restoration, sometimes there are a few hours of the technician. mostly it comes with combat damage . about 100 units are being repaired here, mainly from the zaporozhye and kherson direction, 80, which was installed in just a day during the hostilities. got hurt needed a last test. then head back. well, it's a special military operation. the rangefinder checked the loading system. again the same mechanism for loading the charge will already be in service on the undercarriage tomorrow, check the car , then check again the measurements hold back the fuel check the oil, well, everything, in principle, look at the leaks, if everything is
strengthen the armor the equipment is given to the crew only after careful processing of the check, yana shcherbatayabout the work of the masters , though light, but in need of repair. here we have a malfunction in the fire control system. uh, the blocks are out of order. uh, the machine quickly restored and this tank during the battle and the barrel was completely torn off; a fragment of a damaged technician enters the repair regiment immediately from the front line for restoration, sometimes...
13
13
Jan 10, 2023
01/23
by
RUSSIA24
tv
eye 13
favorite 0
quote 0
transport urgently asks drivers to plan the route in advance how the repair work is going on, yana shcherbatayaere is not a single car traffic today. it is forbidden here from 3:00 at night to cross the kerch strait on the way through the water. it is impossible in any of the directions about the restrictions drivers were notified in advance at all entrances to the bridge there are signs prohibiting passage and traffic police officers are on duty warning drivers about the temporary closure of the bridge on the bridge itself, large-scale restoration work is underway at this time, the builders are laying a new span on the automobile part. there are two overpasses, damaged. the bridgemen have already removed the damaged bollards on the supports on the branches of the bridge leading from the crimea to the krasnodar territory. today, the sliding of the first span began; a multi-ton structure was delivered at night to do this and block traffic. on the bridge, perform this work without such restrictions. it is impossible to complete the sliding plans today by sixteen o'clock immediately after this aut
transport urgently asks drivers to plan the route in advance how the repair work is going on, yana shcherbatayaere is not a single car traffic today. it is forbidden here from 3:00 at night to cross the kerch strait on the way through the water. it is impossible in any of the directions about the restrictions drivers were notified in advance at all entrances to the bridge there are signs prohibiting passage and traffic police officers are on duty warning drivers about the temporary closure of...
8
8.0
Jan 31, 2023
01/23
by
RUSSIA24
tv
eye 8
favorite 0
quote 0
and the installation of lighting will begin, we will earn money and observe our correspondent yana shcherbatayaom bridge of the heat pipeline, and the neighboring ones are undergoing repairs for restoration work, here is the one the site and the very span that the specialists assembled today, well , this process is not yet completed until the construction is completed over the next few days, it will be necessary to lower and install this structure in the design position . only 6.5 hours, it took to slide the structure of such risers is called the process when the span with the help of jacks is moved from one branch of the bridge to another complex technical work, the specialist performed each time faster and faster today it was planned to open the traffic at 12 o'clock. but early in the morning at 6:30 the cars drove through the kerch strait. the repair of the crimean bridge is proceeding quickly and far behind schedule in record time after the october 8 terrorist attack, traffic on the overpass was launched just a few hours later. the work was colossal, but for the builders of the crimean brid
and the installation of lighting will begin, we will earn money and observe our correspondent yana shcherbatayaom bridge of the heat pipeline, and the neighboring ones are undergoing repairs for restoration work, here is the one the site and the very span that the specialists assembled today, well , this process is not yet completed until the construction is completed over the next few days, it will be necessary to lower and install this structure in the design position . only 6.5 hours, it...