technological complex was designed from the very beginning for new generation trains, report by yaroslav rossiyankahe heart of the big circle line until the construction is completed, which remains only a few months, the aminevskoe depot, the largest not only in the city in the country, is the only one that will be able to serve the longest metro line in the world. we are only in last year began to vacate the territory of the dismantling of the building here and so on, and so the deadline for construction. we literally calculate 12 months against 36 standard, performed in the planned depot mode. builds at the same time. almost 2,000 people. it will be a large-scale complex, 60 buildings, repair buildings, canteen , utility rooms, substations, offices for the medical service, gyms, rest rooms for locomotive crews so that the depot becomes a full-fledged and integral part of the transport systems. need, of course, rails. now they have begun to lay them, that is, after the end of the shift, metro trains will pass here and get into the repair building, such an analogue of both night parking and a servi