started long before this current management of energoatom came to the company, it was still under yury nedashkovskye head and president of energoatom and laid the foundation for the diversification of nuclear fuel supplies , reducing dependence on russia, that was all - it's the first time fuel is physically loaded, it's correct. no, it's the same . it's the same. so, as for the above 1000 , it's not the first time. it was a lot. it 's been done there for a long time. it concerns vvr 440 - yes, it is the first for the vv-440 reactor in ukraine, it is the first, but it is not the first in the world in principle, as reported by the energy company, because what does it mean for such a vv-440 installation, there were still loadings and so to speak experimental experiments from the finnish company slovisa and then together with westinhouse, the electrician of the campaign. it means that they were loaded and processed , which means that the nuclear fuel for the vvr 440 was processed. this means that it is hungary - the reactor means that the tractor means that i will save a little, just look at one otra