yury vladimirovich lebedev, general director of gazprom pererabotka, blagoveshchensk, reports that afterull capacity , the amur gpp will process 42 billion cubic meters of gas per year, our plant has already become the basis for the formation of a large gas chemical cluster in the amur region , the products of the amur gpp and there propane butane pentane. hexane will serve for the production of polyethylene, polypropylene, various plastics, building materials, motor fuels and other products that are in demand by the economy of our country and abroad. rare helium gas, which our plant will produce in large quantities, is necessary for the development of high-tech industries, instrumentation, cosmonautics , electronics, as well as medicine nearby with the factory. a gas chemical plant is currently under construction a complex that is infrastructurally and technologically connected with our enterprise. today, the best specialists from all over the country are moving to the city of svobodny for the construction and operation of the amursky kpz. a workforce with unique competencies is being f