the bridge will connect the simonovskaya embankment under construction with the district yuzhnoportovaya. this will significantly unload sections of the third transport ring and andropov avenue. artem kuznetsova will also improve the transport accessibility of new quarters only the builders are ready for 85% already a view of the outline of future sidewalks and the roadway remains to be completed a little and soon pedestrians will appear here and cars will drive for vehicular traffic two lanes will be organized in one direction and two in the other a new bridge, a unique engineering structure for it construction. it took more than 4,000 tons of metal to the old bed. but on the other hand , it’s new under, after all, a small angle leaves the moscow river. and here we are on the canvas, and below are two channel supports. they also repeat the angle of this zaton that is, they are also at an angle to the superstructure. here, two types of reinforced concrete are placed on the side of the coast, and metal ones are placed on the surface. in the water horizon. it means that it is necessary to