the direction of the railway goes through zapadnoye biryulyovo and ends.lding such a large infrastructure facility near the moscow ring road. in this area it was possible only in at a certain time of the day, due to the movement of work trains, night windows were made , the windows were literally there for 2-3 hours, our moscow railway dictates its own rules. we, as builders, have to adapt to this. go laying, asphalt landscaping, installation of fencing , installation of lighting systems, it’s like finishing work when building houses, when the most difficult thing is behind this site, this site will be integrated into the biryulyovo west district highway, it will be integrated with road street, which is essentially a backup of the varshavskoye highway, and therefore the trips of motorists will, of course, become faster and more comfortable when everything is ready for the route without a single traffic light. connect the highway. enthusiasts ryazansky prospekt. third transport ring, volgogradsky prospect, kashirskoye highway. the southern direction and thr