zaros is necessary. will the father under the drift of the best work warning six knots at the facility percentage of 150 people. at home, the skin will touch a couple of thousand specialists. it is also necessary that the site is, in fact, the territory of the city, which is saturated, er, with a large number of networks, where it will be necessary for it to solve a large number of engineering problems. this will be a dewatering. this is necessary in tight spaces. uh, launch a metro tunneling complex. eh, for now design work is being carried out. and to find survey work and also demolition work in order to prepare and launch the metro tunneling complex, work is underway on the first second third node. uh, this is the druzhby narodov park station, a stretch between the komarovskoye station, the druzhby narodov park, we are preparing the territory, we are shifting engineering networks, engineering networks in the form of heating networks. water supply, sewerage , communication lines, electrical cable lines