bozorgzadeh said about this, 36,000 rings of electricity the permitted agricultural wells that have overharvested are limited using the same method. it is the responsibility of the meter to fully wait for the implementation of the law to install meters on wells and control the amount of water withdrawal. 10,000 meters that measure water have been installed on the wells, of course, about 20,000 of them are out of order due to the activities of the exploitation period , about 80,000 to 90,000, we now have controls installed on the wells, which compared to the total our wells are considered a low number, and this means that although these wells have water, they are open to take water like unauthorized wells. almost extra volume the harvesting of our authorized wells in tehran province is something equivalent to the volume that is happening through unauthorized wells. although the 40-year wait for meter installation continues, it seems that harvesting from these agricultural wells has not been left alone. we equipped nearly 220,000 of these wells with meters. at the same time, through energy consumpt