mohammad hadi hajizadeh, garh news agency ganaveh deputy minister of energy said that if the replacement plan is implemented and the capacity of bardeh energy's motor cooler is implemented within 4 years, there will be electricity problems in the country. according to mr. kamani, it is possible to save 5,000 megawatts of electricity in the country by producing 5 million highly efficient cooler motors. it is estimated that about 20 million. water coolers are working all over the country , if we can replace them in one period , we will reduce consumption by about 500 megawatts. there are 5,000 megawatts at the place of consumption. if we want to calculate the power plant capacity , it will be about 8,000 megawatts it is very high. to start this work, we currently have a sample plan with financial resources that the ministry itself collects we will start soon, god willing. we will do this as a sample in two or three parts of the country, and then we will have to get the necessary permits, including through article 12 of the economic council, so that, god willing, we will be able to do this