0
0.0
May 28, 2024
05/24
by
RUSSIA24
tv
eye 0
favorite 0
quote 0
such assessments are given by the operator of the five seas lake baikal project, the state corporationre the bottleneck is the airport. it is designed for 5 million passengers, last year it already exceeded... 4,300,000 . the issue of its expansion will be decided. as for roads, the resort already has fairly good transport accessibility, but a high-speed highway will also appear. we are already under construction on behalf of the president, the next part of the primorsky ring, the so-called, maybe you already took advantage, well, in fact, you definitely took advantage of it when driving from the airport to kaliningrad, part of it, this is a large highway, high-quality, high-speed. along the entire coast, which will unite our entire coastal zone, and so the section of this coastal ring will just reach the amber ring, next to which we have this future project, a white dune. project costs are estimated at more than 400 billion rubles. will an already proven scheme of public-private partnership is being used for the development of infrastructure, and this is not only roads, but also sewer
such assessments are given by the operator of the five seas lake baikal project, the state corporationre the bottleneck is the airport. it is designed for 5 million passengers, last year it already exceeded... 4,300,000 . the issue of its expansion will be decided. as for roads, the resort already has fairly good transport accessibility, but a high-speed highway will also appear. we are already under construction on behalf of the president, the next part of the primorsky ring, the so-called,...
0
0.0
May 28, 2024
05/24
by
RUSSIA24
tv
eye 0
favorite 0
quote 0
such assessments are given by the operator of the five sea lake baikal project, the state corporationation. it already has fairly good transport accessibility, but a high-speed highway will also appear. and another one is being built, that is, it’s just a highway, a highway, and there in general, when does it end, when does the deadline expire? we already have a contractor working, this is a federal project, this is the supervision of rosavtodor, but according to all plans they can finish even faster, they say that in 1927 they are ready to complete it at the beginning, so i think that in 1927, we will actually be able to take a ride with you and look at this road. there will be several clusters on the territory of the white dune resort, this is a sanatorium-resort with 11.00 rooms, a public and business cluster, and a shopping cinema cluster. here you can do water sports, go to a water park, and you might even have your own kids. in general, there are a lot of ideas. but perhaps the important thing about the resort is that we see this story in such a way as to create a water body and
such assessments are given by the operator of the five sea lake baikal project, the state corporationation. it already has fairly good transport accessibility, but a high-speed highway will also appear. and another one is being built, that is, it’s just a highway, a highway, and there in general, when does it end, when does the deadline expire? we already have a contractor working, this is a federal project, this is the supervision of rosavtodor, but according to all plans they can finish...
0
0.0
May 28, 2024
05/24
by
RUSSIA24
tv
eye 0
favorite 0
quote 0
lake baikal state corporation tourism of the russian federation and the bottleneck here is the airportt already transported 4,300,000, the issue of its expansion will be resolved. as for roads. the resort already has fairly good transport accessibility, but a high-speed highway will also appear. we are already building, on the instructions of the president, the next part of the primorye ring, the so-called one, maybe you... have already taken advantage of it, well, in fact, you definitely took advantage of it when you were traveling from the airport to kaliningrad, part of it, this is a large, high-quality, high-speed highway along the entire coast, which will unite our entire coastal zone, and so the section of this coastal ring will just reach the amber ring, next to which we have this future white dune project. project costs are estimated at more than 400 billion rubles. an already proven state scheme will be used. basically, this means that with average earnings, it grows, by the way, 1000 rubles. well, strictly speaking, they spend from 70 to 130 thousand rubles per trip, the aver
lake baikal state corporation tourism of the russian federation and the bottleneck here is the airportt already transported 4,300,000, the issue of its expansion will be resolved. as for roads. the resort already has fairly good transport accessibility, but a high-speed highway will also appear. we are already building, on the instructions of the president, the next part of the primorye ring, the so-called one, maybe you... have already taken advantage of it, well, in fact, you definitely took...
11
11
May 28, 2024
05/24
by
RUSSIA24
tv
eye 11
favorite 0
quote 0
such assessments are given by the operator of the five seas lake baikal project, the state tourism corporationtleneck here is the airport, it is designed for 5 million passengers, last year it already transported 4 million 300,000, the issue of its expansion will be resolved. as for roads, the resort already has quite good transport accessibility, but there will also be a high-speed highway. we are already building , on the instructions of the president, the next part of the so-called coastal ring, maybe you have already taken advantage of this, well, in fact, you definitely have taken advantage of it. we drove from the airport to kaliningrad as part of it, this is a large highway, high-quality, high-speed along the entire coast, which will unite our entire coastal zone, and so the section of this coastal ring will just reach the amber one, next to which we have this future white dune project. project costs are estimated at more than 400 billion rubles. an already proven scheme of public-private partnership for development will be used. jobs, taxes and tourist flow. the regional authorities ha
such assessments are given by the operator of the five seas lake baikal project, the state tourism corporationtleneck here is the airport, it is designed for 5 million passengers, last year it already transported 4 million 300,000, the issue of its expansion will be resolved. as for roads, the resort already has quite good transport accessibility, but there will also be a high-speed highway. we are already building , on the instructions of the president, the next part of the so-called coastal...
0
0.0
May 1, 2024
05/24
by
RUSSIA24
tv
eye 0
favorite 0
quote 0
the investor from the state is the russian federation tourism corporation.n addition to material support, the russian tourism corporation will help in reducing administrative barriers, marketing the project, attracting additional investments, interacting with government agencies and much more. if you want to cooperate with a corporation. first, you should register on the online platform for investors and fill out an investment questionnaire. after its assessment, it will be possible to sign an agreement of intent to jointly develop a master plan and implement the project. today, any entrepreneur can go to the information portal turism of the russian federation, get acquainted with existing investment lots and finance the development of tourism infrastructure, or leave a request for support of their own project. corporation experts will promptly contact each remaining person. application to help in the formation of the questionnaire, in the formation of the necessary documentation and applications for obtaining additional funding, if necessary. let us repeat
the investor from the state is the russian federation tourism corporation.n addition to material support, the russian tourism corporation will help in reducing administrative barriers, marketing the project, attracting additional investments, interacting with government agencies and much more. if you want to cooperate with a corporation. first, you should register on the online platform for investors and fill out an investment questionnaire. after its assessment, it will be possible to sign an...
0
0.0
May 11, 2024
05/24
by
RUSSIA1
tv
eye 0
favorite 0
quote 0
denis manturov and the general director of the rostec state corporation sergei chemizov. main tasks that the president set for the turnover. i would like to talk to you now about how this work is being built now and how we plan to exhibit it in the near future, i know that a lot has been done, everything has been adjusted, everything is functioning, but there are issues that require special attention, and we’ll focus on them today. rostec includes the ural carriage plant, the basis of the country’s tank power, an enterprise that produces the most armored vehicles in the world, which are now being modernized based on the wishes of the front. we perform all the setup and fire control systems on this vehicle. in the sverdlovsk region , a batch of equipment with protection around the towers is ready to be sent to the special operation zone. with her t-90 practically invulnerable in battle. unique lanza drones. they are also produced under the auspices of the corporation, and in the west it is with them that russian air superiority over ukraine is associated. atlancets, also c
denis manturov and the general director of the rostec state corporation sergei chemizov. main tasks that the president set for the turnover. i would like to talk to you now about how this work is being built now and how we plan to exhibit it in the near future, i know that a lot has been done, everything has been adjusted, everything is functioning, but there are issues that require special attention, and we’ll focus on them today. rostec includes the ural carriage plant, the basis of the...