that is the one that has a connection to deangelo lot on a blowout preventer. it is in the process of recovering the yellow pawed. that is the interaction between the cables that send signals down that operate hydraulics on the blowout preventer. the goal is, once all the recovery operations are completed, it will be up to the masters to figure out the best location for storm avoidance to ride out the storm. the intention is to put the vessels in a safe place so they can return as quickly as possible to resume their operations. this is not a hurricane, is a tropical storm right now. the forecasts are in the low 40's, so it will be a determination by the folks operating the vessels where to put them to minimize risk to the vessels. we would like to get back on scene and restore the activities as soon as we can. this will always be subject to the conditions out there and the call of the people operating the vessels. the seismic survey vessels, the acoustic vessels and the vessels operating the rov's will stay as soon as possible. we are prepared to leave the well