comissioner antonini: i think it is adequate. there are 3 or 4 major issues. one is preservation. we have to take into consideration a desire to serve. i think they adequately desccribe alternatives as well as the project as presented, and whether it says about changes that would come, i think it is made clear they would be iliminated, and that is more about the actual hearing of the approval of the project. i certainly know the impacts. they differentiate between the impacts between those using 19th avenue as a conduit, and they do a good job of putting measures in place. there could be an increase curiosa fear could be -- it could be an increase. they are not using it as a conduit. that is more discussion curiosa -- more discussion. they make a good case of describing it. the final one is construction impacts, and that was analyzed as well as it can be. we are talking about whether this is thorough enough. i think it is accurate and adequate. comissioner moore: is it accurate or innacurate. at this moment, we are discussing whether it is accurate enough to be certified as descri