. >> translato t tco chairman says that it will take a long time until the situation is ultimatelbrghton d. he says that personally, he thinks it would not be possible for the evacuated residents to return home in a few weeks. >> radioactive iodine and cesium ha bn unin in the basement of the turbine buildings of reactors number one to four, an nns tse the buildings. work to pump the contaminated water into the turbine condenser in the buildings came to a halt at the number one reactor after the condenser became full. meanwhile work to pump the water out of the basements of the number two and three reactors has yet to begin. the tokyo electric power company is going to use a synthetic resin to try to prevent radioactive dust from bomg airborne or from being washed into the sea. the company will try to use the resin around the reactor buildings. the ren solidifies and becomes water resistant when it tries. tepco wants to check in it will contain the contamination before it uses it more widely. >> the head of the french company subsidiary in japan made a pledge in an interview with nhk. >>