m.l.k. chinese immersion, you can enter this school on grade on the first, second, and third floor. there were seven playgrounds at seven different levels. the school is still in progress and it's a lot of fun. this is a typical classroom, chinese immersion, all new cabinet, awe null -- all new cubbies, everything brand new, ready to go. and of course bathrooms are big for those of you who don't know what the district standards are, we have epoxy floors and corian on the walls. these are bathrooms that will take the wear and tear and look new and fresh 15 years from now as one year from now. for those of you who don't know what serious construction really can be,s is the civic center, the normer -- the former john sweatt building, that's what it looks like inside if you walked over there. so this is a total interior redo seismic retrofit and when we're done, everything in this building will be brand new. the outside will look almost exactly the same, complete with children's murals on the outside wall. this is to preserve the historic sort of landmark integrity of the architecture o