the valet services will not be able to drive through the porte- cochere that is there now. the that is not considered in the traffic impact analysis. in the long term, the access to hunt lane is also not guaranteed, so it is possible the long term situation will also be pushing valet operations, deliveries, and garbage out on to these already congested streets. the vacation of hunt line further highlights the inadequacy of the traffic analysis. the findings claim that hunt lane is not necessary and not in use, but the eir response to comments made clear if it is -- that it is, as well as the late improvement measure to have the moma voluntarily of whom -- provide some access to the w in the future. the access to the net,-- to natoma pass is not considered at all, and does not been considered the subject of action, as it is required to be. the third substantive area is the construction impact analysis. they are dismissed in the eir summarily, simply by the statement that these types of impact, because of their temporary nature, are generally considered less significant. whil