>> we would object to a continuance, but i just handed and jon vaughfung the brief, so he may be able to provide some of that information. >> since no one has made a motion to continue, we are going to continue to hear the merits of the case. >> thank you, president and commissioners. i am the director of relations of nextg. thank you for this opportunity to speak to you. even though the appellants talk about it, i want to use this opportunity to give you a background of this facility. there is a large primary utility pole on with three attachments. there are anti knows that extends over the building height, so they are not in proximity with the residents. there has been a protest for this location, and if during that process, and the director reviewed the permit and from the application to be complete, and the necessity was met, so those criteria were met for the permit. in addition, the planning department reviewed this location pursuant to article 25 and found this location would not significantly draft from the nature of this residential area. finally, we will talk about this in m