my name is pat buscovitch, of both briefs. i keyd in on two specific pretty much nonrefutable issues. in 2002 there was a permit to enlarge the building. a cfc was issued. some of the enlargement may not have been papered correctly but what was president in that 2002 permit was a roof deck. in 2002 there was no deck and there's a little confusion about the complaint made monday. the complaint was from 2002, when there was a permit that didn't show this deck, there is no permit to build a deck that now exists, to build a deck. there is a permit to build a fireplace on the existing deck, but a deck isn't existing legal if you don't have a permit for it. so from 2002 when a cfc was issued, which is a controlling document, no permit was issued. this permit is going to legalize a deck that never a permit to be built and decks are counted as a level of occupation for exiting. so someone needs to pay attention how the exiting works from this fiflgt level that was never permitted. they need to remove it off the drawing or solve illega