darren in the front row and artearo smith was here and still maybe here or his jacket is anyway and i have a brief presentation to you. we have been to you in open session describing this project. it's an important transmission project designed to provide reliability of power downtown in the event of a major earthquake. is manny around to start the powerpoint presentation? >> sorry for the short delay. so i will start verbally and the slides can catch up. essentially there are a couple of transmission lines that come up from the peninsula through the po tearo power plant and connect to the embarcadero substation that provide power to downtown. at&t has proposed a new 230kv transmission line to provide redundant transmission line to the embarcadero sub station. at&t and port staff have collectively communicated with the mayor's office, the san francisco public utilities commission and the city administrator about the project. the city administrator was charged by then city administrator ed lee to look at these types of risks to the city in the event of a major seismic event and how we