mr. junius and mr. shannon, indicated there is a possibility to consider that. director ram, if you want to engage with me on that conversation which we had the last few days. >> yes, thank you, commissioner. as i understand it, the concerns that you've raised, they're kind of three major concerns. one is the band above the base of the building and strengthening that so that there is more of a distinction between the base and the upper part and the middle part of the building. the second is the bulk of the building on 2nd street. and the third is modulation and some relief on the tehema street side. i think certainly -- i think there are architectural expressions one can do to the building to strengthen those elements without necessarily reducing the square footage of the building. and i think given that the commission did approve the square footage, we would be happy to work with the project sponsor on resolving some of those architectural issues before the architectural addendum is approved at dbi. >> i believe that mr. pfeiffer who is now working with [speake