. >> they plan to repair the existing lobby chandaleir and to repaint and match the walls. >> the owner has subcured the stabilization of the landmark building and the work is involved in the extensive repairs and the replacement of the system and of water and electrical and trainage and heating system and the staff approved an administrative for the non-visible facades based on the requirements of article ten and the secretary of the interior standards, the staff has determined that the work is compatible with the designs of the building and the owner has also asked trembel to have a separate analysis and they also said that it will meet the approval. >> at the primary facade we found that the proposed treatment in the appropriate and necessary for the rehabilitation of the landmark building of the water and damage requires that many historic features will be replaced, and we are asking however, that these areas are properly documented and drawing photographs prior to me approval so that we can assure that the least amount will be removed as possible. >> the material subtaouses are pro