>> brian soriano. i want to talk about the lack of consistency that transpired at these two meetings. i think the summary that mr. nolly provided is right on. we had contractors out there and had remediation work in response to notices of violation last may. unfortunately early on when they were doing construction work on the outside of the building it created dust infiltration. most of the ten /tphopbts who are owners, residents of this property, simply vacuumed up the dust and went on with life, the tenants in unit 7 went on the day that we were about to go in there and clean the dust infiltration so they could clear out their personal belongings, he called me and asked me to please postpone that because of some serious concerns that are being raised. throughout may i continued to work with david rizolo cooperatively to get testing done so we could address everybody's concerns, which ultimately demonstrated that there was no asbestos involves and no led based contained in the source of the dust that