but there was, the latest complaint was failure of owner to repair a water heater, uninhabitable apartment unit is flooded. we got that on 2-27-15. on 3-4-15 the baker, the inspector yee from housing, it sounds like housing is out there a lot, the baker family called inspector yee with regard to a complaint marc bruno had filed on their behalf, inspector yee called mr. bruno to inform him the meeting would be canceled due to the baker family withdrawing the complaint. that's the only thing i can find with regard to open complaints to do with suspended work. there have been multiple xlaipblts -- complaints filed on the property over the years but they have all been abated. maybe a total of 3 possibly. that's the one having to do with the water heater, that's actually still open for some reason, but last mor was the last action on it. the other thing as well, the permit that was taken out originally was for 478 union street. i wish i had been involved in the fixing of that and not the third floor counter at dbi, when someone pulls a permit under a wrong address, and contractors sometimes do that,