b.c. dc did you get a permit from the baconservation development commission? >> yes. >> did the review board did it go through as well? >> the review board? it is the engineering board for the baconservation development commission. >> i was curious because of the historic engineer. i realize this has come under section 106 consultation. apparently our review as part of more information on evaluating the historic compatibility of the repair with our historic preservation goals. i am interested in other opinions on the historic aspects as well as safety. >> just to add to this, the project is federally funded in part by the federal highway bridge repair program, and they have the requirement of meeting the secretary of the interior standards for the least invasive method to repair the paint. those are employed as part of the design specifications, i'm not sure if that answers your question? >> i was lookingaticly discussion about the -- looking at discussion of the weight. i have to congratulate the public works department. there is a fantastic video on the brid