the general contractor, thompson brooks, began construction. during the deconstruction process, thompson brooks discovered severe fire damage in the external walls of the building. unfortunately, thompson brooks removed these elements with the intent of replacing them in like kind without first seeking a permit to approve this work. this was an administrative error on their port. the conditional use permit is needed because the original permit exceeded the scope of permit and because of the demolition limited in 317. this resulted in a notice of permit suspension. as part of the conditional use authorization, our planner jeff horn has asked the plan are commission to design the project to two units. we've made this provisions and complied with this request, and now we have support from staff. here's a photo of the site today. the project's foundations have been completed, the entire lot has been properly graded for the design, and the existing work has all been inspected and approved by the city, and the entire project is less than six months f