i met a couple of times with richard tam. he was very cordial and asked me to submit new plans, and i did through my engineer. i even went to the new building on august 10, 2020, and met with a gentleman named gary love, and he accepted all of my second and third i think iterations of plans, structural, and i didn't have the second or third or fourth iterations of calculations, and they were given to me by mr. allegria in early september, and i mailed them by certified mail to mr. tam. i never received a green card back. they were mailed by certified mail, so i've done everything can to comply, and i'm still waiting for the permit to be issued, and i believe the language in the permit application 201810314687 plus the attending exhibit, which should have been submitted to planning, which describes the project review application form, that the plans and permit are being submitted to comply with the notice of violation 201888993. i've done everything that i can, and i'm still very patiently waiting to have the permit reviewed a