the far east the legacy of the soviet past today most of the energy capacities here belong to rushydro companyes solid investments for the development of the industry others will simultaneously set up five new thermal power plants and modernize the largest thermal power plants in vladivostok all. this will give the power system of the far east more than 2 gigawatts of power to operate this unit, as a gas-powered unit, almost all equipment was replaced with the exception of the drum, which is above us at plus 35 m. oe, the drum was not replaced. uh, because of its service life is still at least 15 years. today, vladivostokskaya 32 stopped using coal and has been working entirely at the newspaper station for more than fifty years, so almost all turbines , transformers, electrical wiring equipment are being updated to install modern ones. equipment poured new foundation will replace even the walls and roof of the state of the structure. no presupposes that it can be operated for another 50 years, so new equipment is being built. we will build and reconstruct this building in order to ensure the s