they managed to do during this time and when the underpass is completely ready will tell alexandra bystritskayaas not to stop the work of the moscow central circle , two temporary bridge packages were installed over the pedestrian tunnel construction zone in the moscow city area, they will ensure the safe and continuous movement of swallows for the period of the worker. we will have a pedestrian tunnel. here we have 2.5 m in height and 4 m wide , 27 m long, we are now making one wall. we do, we install the second wall on them. one bridge, the second bridge, that's where our window ends. yes, all other jobs. we will produce already under this bridges at depth. seven meters in just a day, the builders turned off and moved the contact network, dismantled the rails, the spatula grating. we need a tunnel in the future. at the moment. we are installing a pipe spatula. later, sofa blocks will be installed, inventory spans will be installed . after that, the contact network will be restored and the path of the mk pedestrian tunnel will be launched, for which it will be ready. 2 1/2 months later this is