, the overhaul of phase one of persian gulf star refinery in bandar abbas has begun, according to the repair and maintenance manager of star gulf oil refinery. fars, the first phase of this refinery is supposed to be repaired in 24 days. now, wow, it's changing . there are no flats behind me, and in addition to the gasoline units, then the green isolation unit . repairs from the smallest to the largest parts will be repaired and reinstalled. the car washing fumes are self-steaming, we did the mobile phone for 160 air coolers, 117 converters, 13 furnaces, and 4 reactors. according to the statement of persian gulf star oil refining company, more than 3,000 domestic experts are involved in these repairs . we cut and change the shape to increase the repair capacity, which is implemented based on the world's current knowledge, is a risk-based inspection , which plays an effective role in significantly reducing repair and operational costs, as well as the stability and reliability of the operation of operational units and the production of repairs , which has not stopped production. our gasoline is now about 40 million liters and of course we have othe