viktor korolkevich, the protocol between gazprom and the belarusian government has already been signed until 2025, gas prices, formed in relation to the russian ruble , today a board meeting was held at the ministry of energy, where they summed up the results of the past year and set one of the most important tasks for 2023. here is the second belarusian power unit. the nuclear power plant is working on the second power unit, its installation readiness is 98%, and the unit is now completing preparatory work for the transition to an important stage - this is the launch of a chain reaction and reaching the minimum control level of the power level of the reactor plant. this is about one percent, but, and then tests will be carried out confirming the nuclear safety of the operation of the reactor installation, that is , the corresponding physical measurements of the test will be carried out. it is planned for commercial operation, in the second half of the year a new milestone in the history of the belaz 2000 auto concern, a dump truck with a carrying capacity of 220 tons left the assembly