the main thing, experts say, is not to taste it artyom kuznetsov gennady palikin, maxim and likashvilinher. about a third of moscow region boiler houses prepared for the new heating season will complete scheduled repairs in the first half september. in the meantime, in several areas with a heat supply system at once. literally rebuilt. why is this needed? and what remains to be done alexander sanzhiev from the inside observed this process. we read the code so that the device, e, starts its moscow region know-how, self-dumping fittings, inside of which there are heating elements, which, when connected to a special device , are soldered to the pipe. dozens of such connections can be made in an hour. they need to be prepared at the beginning of the pipe to degrease connect and place electrodes. the program is selected automatically and welding takes place due to heating. the plastic is melted and the sleeve is connected to the pipe while workers are laying a new section of pipeline. boiler nearby. preventive maintenance is underway, we lubricate the gaskets so that they are next time when