at first, mosoblgaz specialists hoped that they would be able to restore the old heating units, but the survey showed that they were all morally obsolete , many turned out to be mined, they decided not to take risks and built new ones . this year it was warmly cozy about ukraine and the republic, but there was no such lack of funding. people are very, very grateful, especially, especially parents, already by the beginning of the last heating season of the moscow region energy industry, they launched seven block-modular boiler houses, of which three boiler houses were gas and four boiler houses were coal-fired, due to the fact that there were no gas pipelines nearby. it was a non-core task for us. but we also coped with it, another boiler house will be put into operation in the near future, and specialists from the moscow region have also restored 13 power lines with a length of almost 85 km and five transformer substations are being worked on at three more sites. alexey buttons. led pilots for a week in the city. it's a week in the city and the most interesting story, as always, ahead o