the kuznetsk technopark has established the production of independent spring blocks, which is an integratedn from start to finish. investments in the project amounted to about 950 million rubles, almost 250 of which were provided by federal fund for industrial development in the form of a preferential loan. and this is what the process of wire drawing looks like, behind me is a wire rod with high-carbon steel, which is first ground on this machine, then the degreasing process begins with a saline solution, then the wire goes to this machine, where the process of drawing it from five begins. up to 2 mm in diameter. in a nearby workshop , springs of different sizes are formed, which are placed in separate cups made of artificial material. per year from the assembly line 750,000 km of spring blocks come off. the director of the kuznetsk technopark talks about the work of the enterprise under sanctions, logistics routes have changed, views from west to east. now raw materials are supplied by chinese partners. i would note one more positive aspect, since as a result of sanctions, many european m