john pollard has 20 of the 783 notices of violation on on the department's ic tracking list. he has 20. his structural engineer, who works for the structural engineering company he owns, has 11. so why aren't they on the ic list? but the other thing i'd like to mention is that 19 of the 73 noves don't have a contractor number. that's unacceptable. individuals on on the ic program are listed subject to these requirements. you have that slide. housing code violations need to be included in the dbe, ic program. a recent article in the san francisco standard mentioned 11,000 dbe compliance are filed each year. the average number of days to close the complaint is 40 days, and 20% of the complaints are never closed. that's unacceptable. dbe is on pace for 3000 novi in 2023, 6,007, two thirds of those are housing complaints and there are no housing complaints in this program. the bic needs to conduct a formal review of the ic program. dbe should be required to present a self-assessment of the program within the next 90 days. at a future bic meeting. thank you very much. is there any