two districts of the capital, maskoski and frundzinski pakul what is so sweet from the top roof roofshe water is being drained at the achystka station from the village of vadaskhovishcha in vileisk. old pumps are high-power, serviceable and their components are improved. the industrialized power plant burned more than twice as much as 59 thousand cubic meters of water per day. work is underway to expand the building itself to install additional filters in order to increase the power of the station. naturally, in order to increase the productivity of our water intake, additional artesian wells have already been drilled, this means that the existing equipment in the turbine room will be replaced, the volume of water that we need to replace is about 180,000 m3. day, three water intakes of the southern group, they need to be expanded, water intake ostrovy, felitsanova and vitkovshchina. about 100 wells - for this project it is necessary to redrill or drill new ones. often, water from underground sources contains increased amounts of iron and manganese, therefore, to remove these compounds