we pass and enter the village of mandah , 10 kilometers from this village in the shadow of the watershed, it seems to be doing better, now our water has doubled, before our tea water was 14 meters, now it has risen to 10 meters. last year, our garden produced one fruit, but this year, it has increased about 10 times. in order to increase the water in their agricultural wells, the people of the village collected sediment from the watershed structure in the recent flood. 40,000 cubic meters of sedimentary soil that we took out from inside the embankment with the cooperation of the people of the emirate, which cost 600 million tomans. 40 mm of rain in a few days. every minute, it rained in every house and building and produced 40 million cubic meters of flood. in some areas that the afizdari project was planned and implemented , we were able to store 2 million cubic meters of water . watershed management has been done in 50% of the watershed areas of quchan city. in the past years, we have implemented the irrigation project on nearly 90 thousand hectares of these areas, and 90 thousand hect