the oroville dam.
california assemblyman jim
frazier - an engineer - called
some of the spillway design
problems "terrifying."
.the report doesn't yet
specify exactly what triggered
the spillway failure...but
makes it clear it was not up
to the job of handlingthe huge
amount of water.
repairs for all the damage
will cost around 500-million
dollars. pam and
steve?
let's take a look outside
right now for the current
conditions in the bay area...
(pam) chief meteorologist
brittney shipp joins us now
with the forecast.
the surface cold front
associated with this parent
upper low is serving as a
dividing line between an area
saturated with marine