with the united state army corps
of engineer for an embarcadero
flood study.
>> >> good afternoon,
commissioners executive director
forbes and i'm the manager here
to present the federal
cost-share been the united
states corps of engineers and
the port
joined by cal eastbound senior
project planner with the united
states corps of engineers
based out of the capping
production in sausalito we've
had a long relationship with the
u78d and look forward to
continuing that.
>> so some background the
continued authorities program
the architectural on the seawall
project started through the
rivers and harbors act of 1952
and amended as of in conflict to
the united states corps of
engineers that requires at least
4 elected state senators the