all changes thanks to the national project kultura in 3 years purchased modern equipment and overhauledhe puppets destroyed all the walls, removed the roof and, in fact, everything was built anew, so not a single corner. no refurbished. here, the building is not left completely replaced engineering communications. all rooms were insulated, the hall was repaired, the walls of the dressing room were repainted. it used to be all black , the windows were curtained. and now here we have almost greenhouse and naturally. here you drink all these and your partner is already on stage. flowers bloomed in the garden in the chelyabinsk puppet theater after repairs, not only on the stage, miracles are happening throughout the hall. this is a transformer hall, because it can take any position of the floor. it could be a classical seating arrangement, a stage and an amphitheater, or maybe the so-called arena intermission, too, do not get bored considering chairs. they are embroidered with the emblems of the performances that were staged here among the audience there will be some kind of story. and tha